Fleet Overview
ALL PROJECTS — LIVE STATUS SUMMARY
0
PROJECTS
0
ONLINE
0
OFFLINE
0
ACTIVE ALARMS
0 kW
FLEET LOAD
Projects
SITE REGISTER — MONITORING & REMOTE CONTROL
| Project | Client | Location | Link | Plant | Alarms | Load | Last Seen | Actions |
|---|
India Site Map
GEOGRAPHIC DISTRIBUTION OF ALL PROJECTS
● Normal
● Alarm
● Offline
Click any pin to open that project. Outline is a simplified schematic for site
location only — not a survey-accurate or officially delineated boundary.
Sites on Map 0
Unmapped Sites NO COORDINATES
Alarm Centre
AGGREGATED ALARMS ACROSS ALL PROJECTS
| Time | Project | Component | Description | Severity | State |
|---|
Energy Comparison
CROSS-PROJECT CONSUMPTION BENCHMARK
Live Load by Project
| Project | Live Load (kW) | Today (kWh) | Est. Cost (₹) | Chambers | kWh per Chamber |
|---|
Fleet Report
CONSOLIDATED REPORT ACROSS ALL PROJECTS
0
PROJECTS
0
PLANTS RUNNING
0
ACTIVE ALARMS
0
TOTAL kWh TODAY
₹0
EST. ENERGY COST
1) PLANT STATUS SUMMARY
| Project | Client | Location | Link | Plant | Compressors | Avg Temp | Load kW | Alarms |
|---|
2) ENERGY SUMMARY
| Project | Live Load (kW) | Energy Today (kWh) | Cost (₹) | Chambers | kWh / Chamber |
|---|
3) CHAMBER TEMPERATURE SUMMARY
| Project | Chamber | Temperature | RH | Status |
|---|
4) ALARM SUMMARY BY PROJECT
| Project | Critical | Warning | Info | Unacknowledged | Latest Alarm |
|---|
5) RECENT ALARM DETAIL
| Time | Project | Component | Description | Severity |
|---|
Users & Access
CREATE CUSTOMER LOGINS AND ASSIGN PROJECT ACCESS
Security notice — this portal stores accounts in browser local storage for demonstration only.
It is not a secure authentication system: anyone with access to the browser or the file can read
the stored records. Before sharing credentials with a customer, this must be deployed behind a real
server with hashed passwords, HTTPS and session management. See Server Settings for details.
| Username | Full Name / Company | Role | Project Access | Status | Created | Last Login | Actions |
|---|
Audit Log
ACCOUNT, ACCESS AND CONTROL ACTION HISTORY
| Timestamp | User | Action | Target | Detail |
|---|
Server Settings
PORTAL CONFIGURATION & DEPLOYMENT NOTES
Portal
Organisation
Poll interval (sec)
Energy tariff (₹/kWh)
Session idle timeout (min)
Data Management
Stored projects0
Stored accounts0
Audit entries0
Deployment Requirements — Read Before Going Live
This portal is a working front-end prototype. The monitoring values are simulated and the
login system runs entirely in the browser. To operate as a real multi-site master server you need:
1. Server & database — a backend (Node/.NET/Python) with PostgreSQL or similar,
holding projects, users, telemetry history and audit records.
2. Real authentication — passwords hashed with bcrypt/argon2 server-side, signed session tokens or JWT, HTTPS/TLS everywhere, rate limiting and 2FA for admin accounts.
3. Site connectivity — each plant PLC reporting to the server over MQTT, OPC-UA or a VPN-tunnelled Modbus gateway, with store-and-forward buffering for link outages.
4. Control path safety — remote start/stop must be confirmed and interlocked at the PLC, never trusted from the browser. Safety functions (E-stop, gas trip, WFS) stay hardwired on site.
5. Historian & reporting — time-series storage for trends, energy and compliance reports across sites.
2. Real authentication — passwords hashed with bcrypt/argon2 server-side, signed session tokens or JWT, HTTPS/TLS everywhere, rate limiting and 2FA for admin accounts.
3. Site connectivity — each plant PLC reporting to the server over MQTT, OPC-UA or a VPN-tunnelled Modbus gateway, with store-and-forward buffering for link outages.
4. Control path safety — remote start/stop must be confirmed and interlocked at the PLC, never trusted from the browser. Safety functions (E-stop, gas trip, WFS) stay hardwired on site.
5. Historian & reporting — time-series storage for trends, energy and compliance reports across sites.
My Account
PROFILE & PASSWORD
Profile
Username—
Role—
Project access—
Last login—
Change Password
Minimum 8 characters.